Know which systems are ready to hand over, what remains open, and who is responsible for closing it. ELBEMA helps asset owners, EPC contractors, and commissioning teams coordinate system completion from construction through turnover to operations.
Define systems, subsystems, and turnover boundaries using approved drawings, equipment lists, and project priorities. Align the turnover sequence with construction milestones, commissioning dependencies, and the planned start-up sequence.
Set up and maintain completion workpacks and test packs by system, subsystem, discipline, and equipment tag. Link Inspection and Test Records (ITRs), supporting documents, and acceptance requirements so field teams can see what remains outstanding before each package is submitted for review
Coordinate system walkdowns and review completed inspection and test records against project requirements. Track open actions and prepare readiness reviews for mechanical completion, release to commissioning, and handover to operations.
Record and classify punch items using the project’s agreed criteria. Assign responsible parties and due dates, track closure evidence, and flag items that block turnover. Carry forward approved outstanding items with documented ownership and agreed closeout dates.
Compile turnover dossiers with signed inspection records, test reports, acceptance certificates, approved drawings, and punch list status. Coordinate dossier review and track formal acceptance by the designated receiving team.
Track completion by system, discipline, and turnover milestone. Dashboards and look-ahead reports show where progress is slipping, which items are blocking release, and what needs attention before the next turnover date. ELBEMA can work with the project’s existing system or support digital completion using CompleteQ™.